Mr Tyre was already a succesful business when they came to us despite operating from the run down site of an old filling station. The client needed a larger and more presentable new tyre depot to be built on the existing site whilst minimising their lost trading time.

CC Contracting provided a turnkey solution incorporating demolition, construction of a new building and fit out, to be completed in under ten weeks. Careful pre-planning and detailed consultation with the client enabled us to meet all the criteria and complete the project on time.

The project was a real success enabling the client to increase capacity and present a strong, appealing brand to the public whilst transforming a rundown site into a space that properly reflected the thriving business of Mr Tyre